Products > Plant/CMS Software Products > Cable Routing > System Functions
Automatic Cable Routing System Functions
- Automatic Cable Routing Obeying NEC Rules for Segregation and Tray/Conduit Cable Fill
- Raceway Sizing
- Spreadsheet Qury and Update For All ACRS Database Tables
- Automatic Entry and/or Exit Point Based Upon Equipment Location
- Optional Automatic Conduit Selection and Sizing
- Cable Bundle Reports For Construction
- On-line List of Cables and Fill for Raceways
- Cable Pull Cards for Installation
- Optional 3D Review of a Cable's Master Level Route
- Installation Tracking
- Develop Cable From/To List and Cable Types
- Develop Equipment List and Locations
- Layout Major Raceway Paths (Master Level) and Add Nodes
- Route Cables (using interactive or batch) On Major Raceway Paths
- Investigate Cables That Will Not Route and Modify Design
- Identify Tray Capacity Requirements and Develop Carrier Data
- Allocate Cables to Trays and Check Tray Fill
- Develop Cable Tail End Design
- Verify Design with ACRS Reports
- Import Cable Types
- Import Cable From/To List
- Import 3D Tray and Conduit Design to Plant/CMS (optional)
- Establish Master Level Data
- Develop Carrier Data
- Import Cable Vias
- Modify/Add/Route Cables as Needed
| Microsoft Access Database | ||
|
Cable From/To List Includes equipment, cable type and service level |
Cable Type List Includes description and diameter |
Equipment List Includes description, location and top/bottom indication |
|
Master Level Data Includes nodes/geometric path, length and acceptable service levels and capacity used for each service level. |
Carrier Level Data Includes service level, size and capacity used. |
Cable Routing Constraints May contain all or part of a cable route or restrictions of nodes or carriers. |
|
||
CSA's Latest Experience
- Nuclear Plant Cable Design Verification
- Check Cable Segregation in Trays and Penetrations
- Check Cable Proximity Segregation In Penetrations
- Check Cable Redundancy
- Check Cable Via Continuity
- Check Tray Loading
- Check F Factor Between Large Power and Control
- 3D Documentation of Trays and Cable Vias With Output to PDMS

"...object-oriented support to lifecycle activities..."